Experience

Case studies from a $100 million manufacturing operation — and the years before it.

The projects below were delivered for a cabinet manufacturer that grew past $100 million in annual sales. Client name withheld. Earlier work at The Home Depot is included because it is part of how this team was formed.

Retail e-commerce

A made-to-order microsite on The Home Depot domain

We designed, built, and operated a cabinetry microsite on The Home Depot domain — a made-to-order program with catalog and design, integrated with Home Depot checkout. The program generated about $30 million a year in sales. This is uncommon in the category: a supplier site that lives on the retailer’s own domain and still completes the transaction correctly.

The whole operation

End-to-end manufacturing systems, for 15 years

Every transaction in that business ran through systems our team wrote: receiving and stocking, production scheduling, picking, recording each production step, packing, shipping, invoicing, and forecasting what to order. That is a long run in a live plant, not a pilot.

Warehouse

A custom warehouse management system, integrated with SyteLine

Warehouse work lived on standard SyteLine screens — and on SyteLine licenses. We moved those transactions onto custom screens built for the way that warehouse actually worked, still integrated with SyteLine, so the floor got a better tool and the company used ERP licensing more carefully.

Design tools

A custom 3D kitchen layout tool

We built a 3D design tool so customers and sales teams could lay out a kitchen — including for outdoor cabinetry — instead of relying only on static catalogs or hand-drawn plans.

Quoting

2020 Design integration for e-commerce quoting

Designs and quotes from 2020 Design flowed into the e-commerce site, and sales packages were built from those designs so a customer could be sold from a real layout, not a generic list of SKUs.

The plants

Two factory launches, including a Mexico IMMEX operation

We helped stand up the original factory in Florida and, later, a manufacturing operation in Mexico. That second plant included negotiating and implementing an IMMEX arrangement and designing the systems required to run the factory and meet IMMEX requirements.

Earlier career — The Home Depot

Enterprise systems at scale, including work HP later shipped

Shawn Miller started at The Home Depot in 1988, in the early years of the company. After the University of Georgia he joined the systems team as a Unix administrator for thousands of distributed HP-UX systems nationwide, and went on to chief systems engineer, enterprise architect, and department manager.

He developed a backup and recovery system that became the standard method for upgrades and hardware replacements and, over the years, saved the company tens of millions of dollars. Hewlett-Packard later added the approach to its base operating system. He also helped stand up Home Depot’s first offshore development team in India, and was part of the team that launched Home Depot’s initial e-commerce site.

If one of these problems looks like yours, let’s talk.